The ATTACHMENT A items will be heard on the
following dates:
Planning Commission 7:00 P.M.,
Board of
HOLDOVER/RETURNED
APPLICATIONS will be heard on the date in the applications header.
The PC decisions/recommendations may be appealed
to the
An appeal may be made in person at the Current
Planning desk or by fax (702-455-3271). Call Current Planning (455-4314) to find out how to file an appeal.
Help in filling an appeal may be obtained from the Southwest Action
Network (SWAN). You can contact SWAN at:
702-837-0244 · 702-837-0255 (fax)
email: swan@lvswan.org
Note:
If you ctrl+click on the blue underlined text
it will take you to the detailed documents to explain the agenda item.
REGULAR BUSINESS
1. Approve the Minutes for the meeting held on
2. Approve the Agenda with any corrections,
deletions or changes. APPROVED
ANNOUNCEMENTS: NONE
ADDITIONAL BUSINESS NONE
ZONING AGENDA:
PUBLIC COMMENTS NONE
ADJOURNMENT:
ATTACHMENT
A
1. UC-0267-12
– SILVERADO RANCH CENTRE, LLC:
APPROVED Per staff conditions
USE PERMIT for a communication tower and associated uses.
WAIVER OF
DEVELOPMENT STANDARDS to reduce the
separation between 2 communication towers.
DESIGN REVIEW for a communication tower and supporting ground equipment
in conjunction with a shopping center on a portion of 9.3 acres in a C-2
(General Commercial) Zone. Generally located on the southwest corner of
2. VS-0278-12 –
HELD by
the applicant until
VACATE
3. WS-0222-12 –
APPROVED Per staff if approved conditions
WAIVER OF
DEVELOPMENT STANDARDS to increase the
height of an existing off-premise sign (billboard) above the height of a sound
wall.
DESIGN REVIEW for an off-premise sign (billboard) on a portion of 0.7
acres in an M-1 (Light Manufacturing) (AE-60) Zone. Generally located
on the north side of Interstate 215, 300 feet east of
This is a request to allow a billboard to be 39 feet
above the sound wall where 25 ft. is the standard. The billboard is located approximately 20
feet north of the sound wall. Two
factors influenced the TAB to recommend approval. First, billboard was in place before the
sound wall was constructed. Second, is
the curve in 215 and the sound wall effectively blocks half the sign. With
the increased height, part of the sign will be obstructed by a traffic advisory
board.
4. WS-0271-12 – BROOKS, ELIAS:
APPROVED Per staff conditions
WAIVER OF
DEVELOPMENT STANDARDS to reduce the rear
setback for a proposed patio cover in conjunction with an existing single
family residence on 0.2 acres in an R-2 (Medium Density Residential) P-C
(Planned Community Overlay District) Zone in the Mountain’s Edge Master Planned
Community. Generally located on west side of
The applicant has obtained approval letters from the
neighbors affected by the proposed patio cover.
5. WS-0284-12 –
APPROVED Per staff conditions
WAIVER OF
DEVELOPMENT STANDARDS to reduce the rear
yard setback for 1 lot in conjunction with a single family subdivision on a
portion of 52.0 acres in an R-2 (Medium Density Residential) P-C (Planned
Community Overlay District) Zone in the Mountain’s Edge Master Planned
Community. Generally located on the southwest corner of
6. UC-0384-08 (ET-0068-12) – FRESH & EASY
PROPERTY COMPANY LLC, ET AL:
The TAB
recommendations as follows:
APPROVE
·
Use Permit #1
·
Design Review for
convenience store
DENY
·
Use permit # 2
·
Design review for
automobile maintenance facility
USE PERMITS
SECOND EXTENSION OF TIME to commence and
review the following:
1) Reduce the separation from a convenience store to a
residential use; and
2) Reduce the separation from an automobile maintenance
facility to a residential use.
DESIGN REVIEW for a shopping center including a convenience store with
gasoline sales and an automobile maintenance facility on 4.3 acres in a C-2
(General Commercial) Zone in the MUD-4 Overlay District. Generally located
on the southeast corner of
The TAB opinion is significant changes have occurred to
the project since the 2006 application.
The original project was presented as two plots to form one project on
4.3 acres. The approvals were based upon
this being a unified project. Today, it
has broken into four separate parts each operating independently. This is not
the project the original approvals were based upon. The area and this project have
significantly changed over the last six years.
The Circle K project as made progress toward completion
and its use permits and design review should be extended. The applicant did not cover the automobile maintenance
facility during the presentation. When
questioned by the TAB, the applicant admitted this element is an afterthought. The automobile maintenance facility has no
plans and was not shown on the current plot plans presented. After six years, there should be progress
toward project completion. The TAB
recommended the use permit and design review for the automobile maintenance
facility be rescinded.
7. ZC-1346-06 (ET-0075-12) – FRESH & EASY
PROPERTY COMPANY LLC, ET AL:
DENIED
The TAB opinion is significant changes have occurred to
the project since the 2006 application.
The original project was presented as two plots to form one project on
4.3 acres. The approvals were based upon
this being a single project. Today, it
has broken into four separate projects, each operating independently. This is
not the unified project the original approvals were based upon. The area and
this project have significantly changed over the last six years.
The original reasons for offsite deferral were the
pending construction along
Over the last six years, the traffic on
The TAB is concerned that access to
The
8. VS-0290-12 - TORREY PINES-
APPROVED Per staff conditions
VACATE
9. WS-0289-12
– TORREY PINES-
APPROVED Per staff
conditions
WAIVERS OF DEVELOPMENT STANDARDS
to allow modifications to standard drawings for public street sections in
conjunction with a proposed single family residential subdivision on 10.0 acres
in an R-2 (Medium Density Residential) Zone.
WAIVER OF CONDITIONS
of a zone change (ZC-0923-03) requiring a 10 foot wide landscape buffer along
10. VS-0262-12
–
APPROVED Per staff
conditions
VACATE
11. ZC-0261-12
– NEVADA STATE BANK:
APPROVED Per staff
conditions
ADD Current planning conditions
·
Pole
lighting within 200 ft. of residential not to exceed 15 ft.
·
Design
Review as a public hearing for signage
·
Design
Review as a public hearing for significant changes to plans
·
Provide
for left turn into and out of the property along
·
Provide
for cross access at the northwest corner and southeast corner of the property
DELETE Current Public Works condition # 3
RECOMMENDED the local delivery area be
moved as far east and north as possible
USE PERMIT
to reduce the separation from a single family detached residential development
to a large scale retail building.
WAIVER OF DEVELOPMENT STANDARDS
to increase screen wall height.
DESIGN REVIEW
for a large scale retail building (Walmart) on 16.8 acres in a C-2 (General
Commercial) P-C (Planned Community Overlay District) Zone in the Mountain’s
Edge Master Planned Community. Generally
located on the south side of
The
TAB did not have the Public Works comments on this application until after the
meeting started.
A
large box store in this location will significantly alter the adjacent RNP
character and be a significant impact on the residents. It will slow RNP build out and possibly
result in the RNP disappearance. This
discussion was set in motion ten years ago.
When Focus was negotiating with the RNP residents to include the RNP in
the Mountains Edge Master Development Plan, they were told the commercial would
be office professional. At the same
time, in November 2002, this land was zoned, at Focus’ request, for the most
intense commercial use, C-2. The Resolution of Intent (conditional zone change)
on these properties was extended administratively by the County staff in 2011. These
actions have led to this application.
From
a land use perspective, the Walmart is an appropriate use. The fit into the neighborhood is another
question. The fit into the neighborhood
was discussed, at length, by the TAB.
There
is significant noise generated adjacent to the existing residential:
·
Trucks idling adjacent to residential.
o
Walmart trucks drop their trailer, pick
up an empty and leave.
o
Local delivery trucks are in place
longer.
·
Placement of loading zones for daily
delivery along the southern boundary.
o
Truck back up alarms.
·
Delivery hours.
o
TAB opinion is this is not enforceable
by the County.
o
It would be up to store management to
enforce.
·
Sound mitigation and buffering.
o
Approval to build a decorative 8 foot
high wall.
o
Three landscape layers adjacent to residential.
§
Residents requested landscaping to
extend along the southern boundary.
§
Ensure the ability to provide cross
access to commercial property to the south along Rainbow.
·
Discussed use of materials to disperse
sound, not included as a condition.
Traffic
patterns on and off the site.
·
On site traffic pattern places trucks
along southern border.
·
The effects of right in and right out
on Rainbow.
o
Exiting truck traffic is forced to go
south on Rainbow.
o
Potential traffic flow through the RNP
is created with right in and right out only.
o
Currently exiting, north bound traffic
would be forced south to Meranto, west to Montessouri, north to Blue Diamond,
east to Rainbow, then north.
o
North bound traffic on Rainbow required
doing a U-turn at Blue Diamond to enter Walmart.
·
Protected left turn in and out of the
property is needed along Rainbow for good traffic flow.
·
Cross access is needed in the northwest
corner and southeast corner to connect with future development.
·
Applicant stated the intention to
provide crosses access with Terrible Herbst on the north east corner.
o
This access is also needed for traffic
flow among businesses on this corner.
Building
design
·
The building conforms to the Mountains
Edge Development standards.
·
Elevations for the south face were not
shown, may require some additional fenestration facing the adjacent residential.
Lighting
·
The Current Planning condition for site
lighting is appropriate.
·
Additional condition to help prevent
light spill over into the residential areas.
The TAB added the requirement for a 15 foot pole height within 200 feet
of residential uses.
Property
is in
·
TAB position is the applicant has and
will contribute to the offsites via the
·
The requirement for full offsites is a
double payment.
Screening
for mechanical equipment.
·
Residential properties to the west are
significantly higher.
·
How well is the mechanical equipment
screened from these residences?
·
Their site lines, for mechanical
equipment, did not take into account the higher residences to the west.
·
Walmart representatives agreed to look
at this issue.
Trail
Questions
·
Trail ownership, easement and
maintenance were not addressed in the staff agenda sheets.
·
The trail maintenance is not the
responsibility of the Mountains Edge Master HOA along the Walmart property.
·
What agency will request the trail easement?
·
Is a development agreement needed for public
access and maintenance?
·
Who are the entities responsible for
different trail sections?
·
Is there a comprehensive plan for the
establishment, building, easements, constructions and maintenance for the RNP
buffer trail?
The
statements, opinions and observations expressed in this document are solely
those of the author. The opinions stated
in this document are not the official position of any government board,
organization or group. The project
descriptions, ordinances board/commission results are reproduced from publicly
available
David D. Chestnut, Sr.